Quantcast
Channel: SCN : Unanswered Discussions - SAP HANA and In-Memory Computing
Viewing all articles
Browse latest Browse all 4343

System landscape with one missing Hana (2 Hana / 3 ECC)

$
0
0

Hi all,

 

We’re currently working in a landscape with only 2 Hana: one for DEV+Integration (to be connected to 2 ECC : DEV and INT) and the other for the production system (connected to the prod ECC). Any idea on how we can deliver our tested developments on the same environment (the dev) for integration testing ?

 

On the DEV system we would like to have a development version of each object connected to the DEV ECC and an integration version of the same objects connected to the INT ECC.

 

We can copy all objects from one package (dev) to another (int), change the authoring schema and adapt all the inside references. I’m looking for an easier way, ideally with delivery units (which should be the way we will deliver our views on the production system).

 

Any input will be appreciated…

 

Regards,

Fred


Viewing all articles
Browse latest Browse all 4343

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>