Hi,
I launch the report /SDF/HANA_ERP_SIZING in background but this jobs take some resource and I need to stop it so I cancel the job but in se38 say that the job are still running but nothing in SM37 or in SM50.
And this continues to take resources on the system.
Do you already have this problem and how fix it ?
Thank you