Hi All,
We have recently upgraded our HANA to patch level 69. Now we are getting dumps on SPRO & RSA1 transaction.
Category | Installation Errors |
Runtime Errors | DBIF_RSQL_SQL_ERROR |
Except. | CX_SY_OPEN_SQL_DB |
Date and Time |
Short text
SQL error "-10760" when accessing table "BALHDR". |
What happened?
Error Text of the Database: "Memory allocation failed." |
Internal call code.........: "[RSQL/UPDT/BALHDR ]"
Please check the entries in the system log (Transaction SM21).
Error analysis
An exception occurred that is explained in detail below. | |
The exception, which is assigned to class 'CX_SY_OPEN_SQL_DB', was not caught | |
in | |
procedure "BAL_DB_INTERNAL_NO_UPDATE_TASK" "(FUNCTION)", nor was it propagated | |
by a RAISING clause. | |
Since the caller of the procedure could not have anticipated that the | |
exception would occur, the current program is terminated. | |
The reason for the exception is: | |
Error Text of the Database: "Memory allocation failed." |
If the error occures in a non-modified SAP program, you may be able t
find an interim solution in an SAP Note.
If you have access to SAP Notes, carry out a search with the following
keywords:
"DBIF_RSQL_SQL_ERROR" "CX_SY_OPEN_SQL_DB"
"SAPLSBAL_DB_INTERNAL" or "LSBAL_DB_INTERNALU02"
"BAL_DB_INTERNAL_NO_UPDATE_TASK"
Any hint to resolve this issue.
Regards,
Rafikul